In the process of EDM processing, the installation, configuration and preparation of fixtures, these small details are related to processing accuracy and processing efficiency. Generally, the spark machine operation manual must be clearly marked, the installation process of the spark machine fixture installation, configuration, preparation, etc.
When installing and supporting the fixture of the spark machine workpiece, the tightening bolt of the workpiece and other protrusions, it should be as close as possible to the head containing the electrode, and install it in a position where contact does not cause abnormal discharge. At the same time, make sure that the inter-electrode cable used for discharge does not touch the electrode, and do not interfere with the workpiece or fixture. This requires the wiring personnel to control the line position so as not to cause unnecessary trouble to the subsequent processes.
Please install the workpiece and fixture correctly and firmly, and tighten the electrode holder to prevent the electrode holder from loosening and affecting the processing quality. Screws in any part must be in place to avoid the slight vibration of the machine tool during work, which may cause the screws to be loosened and affect the machining accuracy.
Before pressing the confirm key, please make sure that your hands, tools, etc. do not get caught between the head and the workpiece, so as to avoid the danger of personal safety or damage to the machine tool. There is also to avoid heavy objects hitting the machine tool, causing unnecessary machine tool damage.
During the operation of the spark machine, it is necessary to perform safe and standardized operations in each link to achieve better production.